Инструкция на S45-2 (English)Страница 5 из 17
1. Any freight damage must be noted on the freight bill before signing and reported to the freight carrier with a freight claim established . Identify the components and check for shortages are discovered , contact Hanmecson International ,Inc . immediately . 2. Consult building owner and / or architect’s plans when applicable to establish the best lift location .The lift should be located on a relatively level floor with 4” minimum thickness , 3000 Psi concrete slab that has been properly cured . There can be no cracks in the slab within 36” of the base plate location , and no seams in the foundation within 6” of its’ location ! Remember : any structure is only as strong as the foundation on which it is located ! 3. This lift has two set-up dimensions as below: A. LOW set-up Between inside base plate : 103” Inside Columns: 110-3/8” Overhead Clearance: 138-1/4” Ceiling Height Required: 142” B. HIGH set-up Between inside base plate: 103” Inside Columns: 110-3/8” Overhead Clearance: 142-1/4” Ceiling Height Required: 146” Check for ceiling clearance first to see how high the lift can be set up in your bay . STEP 1: After unloading the lift , place it near the intended installation location . STEP 2: Remove the shipping bands and packing materials from the lift . The power unit and cylinders will be unpacked from the top . STEP 3: Open the wrapping from the upper column and carefully remove the parts from inside . Unbolt the column from the shipping brackets . Unbolt the up-rights (Item #1 in the parts list) from the columns and assemble it to the column (Item # 2 in the parts list). STEP 4: Unpack the cylinders and open the oil port on each cylinder by unscrewing the black plastic cap . Move the carriage up about 20” to 25” . Next , carefully slide the cylinder inside from the bottom of the carriage . The oil port will face the backside of the column and the notch on the bottom of cylinder will fit into the hole in the center of the base plate . STEP 5: Position the columns facing each 103” inside base plate. Square the columns by measuring diagonally from corner points on base plates (within 1/4”) . STEP 6: Using a 3/4” diameter concrete drill , drill the holes in the main side column, installing anchors as you go. Use a block of wood or rubber mallet to drive anchor bolts in, Drill to a minimum depth of 4” to insure maximum holding power. Drilling thru concrete (recommended) will allow the anchor to be driven thru the bottom if the threads are damaged . |