GENERAL INFORMATION

1. Any freight damage must be noted on the freight bill before signing and reported to the freight carrier with a freight claim established . Identify the components and check for shortages are discovered , contact Hanmecson International ,Inc . immediately .

2. Consult building owner and / or architect’s plans when applicable to establish the best lift location .The lift should be located on a relatively level floor with 4” minimum thickness , 3000 Psi concrete slab that has been properly cured . There can be no cracks in the slab within 36” of the base plate location , and no seams in the foundation within 6” of its’ location ! Remember : any structure is only as strong as the foundation on which it is located !

3. This lift has two set-up dimensions as below:

A. LOW set-up

Between inside base plate : 103”

Inside Columns: 110-3/8”

Overhead Clearance: 138-1/4”

Ceiling Height Required: 142”

B. HIGH set-up

Between inside base plate: 103”

Inside Columns: 110-3/8”

Overhead Clearance: 142-1/4”

Ceiling Height Required: 146”

Check for ceiling clearance first to see how high the lift can be set up in your bay .

STEP 1: After unloading the lift , place it near the intended installation location .

STEP 2: Remove the shipping bands and packing materials from the lift . The power unit and cylinders will be unpacked from the top .

STEP 3: Open the wrapping from the upper column and carefully remove the parts from inside .

Unbolt the column from the shipping brackets . Unbolt the up-rights (Item #1 in the parts list) from

the columns and assemble it to the column (Item # 2 in the parts list).

STEP 4: Unpack the cylinders and open the oil port on each cylinder by unscrewing the black plastic cap . Move the carriage up about 20” to 25” . Next , carefully slide the cylinder inside from the bottom of the carriage . The oil port will face the backside of the column and the notch on the bottom of cylinder will fit into the hole in the center of the base plate .

STEP 5: Position the columns facing each 103” inside base plate. Square the columns by measuring diagonally from corner points on base plates (within 1/4”) .

STEP 6: Using a 3/4” diameter concrete drill , drill the holes in the main side column, installing anchors as you go. Use a block of wood or rubber mallet to drive anchor bolts in, Drill to a minimum depth of 4” to insure maximum holding power. Drilling thru concrete (recommended) will allow the anchor to be driven thru the bottom if the threads are damaged .