Документация

Инструкция на 2-Post Lifts S4B-2/T4 (англ.)

Страница 10 из 31

• Check safety lock audibly and visually while in operation.

• Check safety latches for free movement and full engagement with rack.

• Check hydraulic connections, and hoses for leakage.

• Check chain connections - bends, cracks-and looseness.

• Check cables connections- bends, cracks-and looseness.

• Check for frayed cables in both raised and lowered position.

• Check snap rings at all rollers and sheaves.

• Check bolts, nuts, and screws and tighten.

• Check wiring & switches for damage.

• Keep base plate free of dirt, grease or any other corrosive substances.

• Check floor for stress cracks near anchor bolts.

• Check swing arm restraints.

WEEKLY MAINTENANCE(40 HOURS)

• Check anchor bolts torque to 150 ft-lbs for the 3/4'' anchor bolts. Do not use impact wrench.

• Check floor for stress cracks near anchor bolts.

• Check hydraulic oil level.

Check and tighten bolts and nuts, and screws.

• Check cylinder puller assembly for free movement or excessive ware on cylinder yoke or pulley pin.

• Check cable pulley for free movement and excessive ware.

YEARLY MAINTENANCE

• Lubricate chain

• Grease rub blocks and column surface contacting rub blocks.

• Change the hydraulic fluid, good maintenance procedure makes it mandatory to keep hydraulic

fluid clean. No hard fast rules can be established;, operating temperature, type of service,

contamination levels, filtration, and chemical composition of fluid should be considered. If operating in dusty environment shorter interval may be required.

Страницы: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

Пароль
Вход забыли пароль? Регистрация

Платные услуги