Insurance level adjustment.

-if the unparallel of the basement lead to the unparallel of the platform, can adjust the height of the safety rod.

-lift the platform approximately 100mm; press “down” button let the insurance go into the hole of insurance rod.

Steel line adjustment

-lift the platform approximately 1000mm.

-fix the steel line bolts after level adjustment.

-No load of main machine test

-turn on the power QS. (If equipped with electrical carriage, turn the selector switch to “main machine”)

-press “up” button SB1, main platform lifted.

-press “down” button SB2, and press insurance hand, the platform is lower.

-press “lower”, four insurance locking.

-check the lift of main machine is placidity, and the locking is secure, check whether the oil line is leakage.

NO PERSON AND THING LEAVE UNDER OR ON THE LIFT.

Press button SB0 if there is something abnormal.