Инструкция на TT-5.5F4 (новый, англ.)Страница 17 из 30
If equipped with pneumatic carriage -press the pneumatic switch on the pneumatic carriage, lift approximately 300mm. - press the other side of pneumatic lift the safety rod of rolling jack, lower the rolling jack. -press the other side of pneumatic pump, verify the insurance instruction. If equipped with electrical carriage. -turn the selector switch to “rolling jack” position. -press “up” button SB1, lift approximately 300mm. -press “down” button SB2 and lift the safety rod of rolling jack, lower the rolling jack. -press “down” button SB2, verify the safety instruction is reliable. Electrical rolling jack limit adjustment -clicking “up” button SB1, lift approximately 370mm. -adjust the process of limit switch SQ. -clicking the procedure of lifting verity the accuracy of rolling jack. Anchor bolts installation -affix the lift to the concrete base with 16 anchor bolts using a percussion drill into 120mm. -At first, no expansion bolts are installed. Level adjustment -adjust the level of the two front turntable and the slide plates on both sides at back. Страницы: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 |