Инструкция на TT-5.5F4 (новый, англ.)Страница 15 из 30
Electrical routine connection: According to the electric connection. Skilled personnel only are allowed to perform the operations shown below. -open the control box front cover -connection of power supply: the 400 three-phase five-wires (BVR-3*2.5mm2+2*1.5mm2) for power supply are connected to terminals 1#, 2#, 3#,N.The PE is connected to the ground wire. -Electric motor wire connection: connect the control box with U12 #> V12#> W12# electric wire to motor wire box. -therefore if you wish the lift to operate at 230V three-phase, change the connection on the transformer and motor. The limit switch connection (equipped with electrical carriage) Connect the PE, 102# from the control box with metal hoses to the limit switch of electrical rolling jack. Hydraulic hoses connection Connect the hydraulic hoses as oil route connection drawing. Only skilled and authorized personnel can operate. Be careful about the connection of the oil hoses to protect the hoses from dust and impurities. Electrical carriage oil line connection: Страницы: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 |